This project presented an enormous challenge for the Resolve team being a brownfield construction involving the design, replacement and construction of an existing Substation and 1MVA Transformer, Main Switch Board and four associated tenancy supply Distribution Boards necessitating direct coordination with over 30 tenants. All works were meticulously scheduled and programmed utilizing management software and systems so as to ensure there was no disruption to the shopping centre and associated tenants trade. Well planned, intricate shut-downs and change over periods were required whilst maintaining direct liaison and integration around the clock with the centre’s operations team. These works were completed without issues and led to the award and completion of two additional packages of works.